Zainstaluj FLASH PLAYER klikając link... http://www.adobe.com/go/gntray_dl_getflashplayer
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/729239temp2.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/995468temp4.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/851174szyper_5_lustro_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/501455stokrotka_2_lustro_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/839253polana_2_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/756156orkan_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/316795maciejka_dr_lustro_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/718927kawka_3_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/673455bosman_dr_w1d.jpglink
http://www.domy-drewniane.com/components/com_gk3_photoslide/thumbs_big/278710batuta_2_dr_w1d.jpglink
Domy szkieletowe Domy szkieletowe Kontakt Domki drewniane letniskowe Domy szkieletowe Kontakt Domki drewniane letniskowe Kontakt Domy szkieletowe Kontakt
shell unit

Shell unit

A list of works carried out

Materials along with labor work and transport to the site

 

  1. Assembly of steel anchors every 90 - 100 cm.
  2. Insulation of the foundation - overground level.
  3. Execution of horizontal damp insulation (2 times glue roofing paper) for the skeletal construction.
  4. Impregnated groundsill.
  5. Screwing the groundsill to a concrete slab with steel anchors every 90 cm - 100cm.
  6. Assembly of exterior walls to the groundsill (structural thickness of 198 mm x 42 mm)
  7. Execution of partition walls with a cross section of 140 mm on the ground floor
  8. Hanging external walls from the outside with OSB-3 slab (www.kronopol.com.pl) of a thickness of 12 mm.
  9. Laying wind insulation on external walls.
  10. Assembly of floor beams (thickness - 198mm x 42mm)
  11. Assembly of a rafter framing with a section of the rafter in accordance with the design.
  12. Execution of roof ties between the rafters in accordance with the design.
  13. Assembly of a roof membrane.
  14. Assembly of rules sized 40mm x 50mm.
  15. Execution of bracings.
  16. Making chimneys from prefabricated units - in accordance with the design.
  17. Assembly of plasterboards on chimneys inside the building.
  18. Assembly of white two-panel windows by Plastimet with treatment.
  19. Assembly of solid wood exterior doors in a color that was agreed upon with the Investor, along with processing of door thickness of 72mm (two locks insulated)
  20. Assembly of a garage door (the door is insulated [Scandinavia], buildings are with the garage)
  21. Metal shingle roofing in a color agreed upon with the Investor.
  22. Roof structure insulated with mineral wool of a thickness of 20 cm
  23. Assembly of flashings (roof).
  24. Execution of external insulation - mineral wool of a thickness of 10 cm.
  25. Execution of floor insulation - mineral wool of a thickness of 20 cm.
  26. Execution of the façade - acrylic plaster by KABE or wood - board thickness of 19 mm
  27. Assembly of gutters and downpipes by Canyon in a color as agreed upon with the Investor.
  28. Assembly of a wooden soffit board on the outside
  29. Assembly of external sills made from plate in a color as agreed upon with the Investor.
  30. Execution of wall insulation of a thickness of 15 cm - mineral wool (internal walls).
  31. Execution of wall insulation of a thickness of 20 cm - mineral wool (exterior walls).
  32. Assembly of a vapor barrier membrane on the external wall (inside the building)
  33. Execution of a gravity and ventilation installation - kitchen, bathroom, living room (if there is a fireplace).
  34. Assembly of fireplace diffusion with a recuperative heat recovery option
  35. Execution of a fireplace - 18 KW fireplace insert with a casing
  36. Covering interior walls with OSB board - 12 mm (walls, ceilings)
  37. Laying drywall (plasterboard) by Rigips or Knauf of a thickness of 12.5 mm on walls and ceilings, laying waterproof plasterboard in bathrooms + filling connections
  38. Painting ceilings white with acrylic paint
  39. Assembly of pine internal doors with treatment
  40. Assembly of interior wooden windowsills in a color as agreed upon with the Investor.
  41. Assembly of wooden railings (buildings with balconies)
  42. Execution of stairs - wooden or composite external terraces
    Wood used for the assembly of the wooden skeleton:
  • Pine I class II and III, with no biological corrosion, snags.
  • Pre-dried in the air, redried in a chamber at a temperature of about 60 degrees.
  • Planed from four sides
  • Moisture level of about 16% -18%
  • www.domy-drewniane.com

Prices of constructing a residential building per square meter of usable area - 7.600 Norwegian krones.

Dremex Company provides transportation of all materials for construction.

The Investor does foundation for building, sewage system, electrical system, underlayment and floor insulation (ground floor) on his own.


 